HCTronic Heater-Cooler “Single-Pas” System positioning

  • Technical Unit outside Operating Room at Operating Complex or technical layer.

  • Positioning of the Technical Unit one level higher
    (up to 4 meters is permitted).

  • The distance between the Technical Unit and
    the Console on the OR is a maximum of 10 meters.

  • Maximum distance of 5 meters between Console and oxygenator/cardioplegia heat exchanger.

  • The maximum unidirectional length of pipes/tubes is
    15 meters.

concept.png

Disclaimer: This product is not approved for clinical use.

HC-technical.png